Primavera P6 assurance XER files stay on this device
Find the change
they did not explain.
Upload the schedule, narrative and previous commitments. ProjectLens shows what materially changed, what was not explained and which decisions need attention.
Build the submission pair
XER does not guarantee a complete baseline, risk record or schedule narrative. ProjectLens shows what it received before drawing conclusions.
Show what the XER cannot prove alone
Attach what is available. Missing items remain visible in the completeness report and limit the conclusions.
Contract-specific review rulesAdjust the acceptance thresholds before running the review
What is missing matters
ProjectLens reports what the submission can and cannot support before presenting findings.
Review ready
Critical and near-critical evidence
Uses exported total float and relationships. ProjectLens does not recalculate the P6 critical path.
Was the material change approved?
Matches activity codes and decision language. Unlinked changes become questions, not accusations.
Current dates against baseline
A baseline comparison appears only when a separate baseline schedule is supplied.
What deserves attention
Executive view shows the smallest useful queue. Analyst view retains the wider material set.
Move from insight to action
Each question retains the evidence that produced it. Add the useful ones to the local review log and assign an owner.
Did the response work?
When a later submission is reviewed for the same project, ProjectLens checks whether linked signals resolved, repeated or cannot yet be assessed.
Close the loop next month
Actions are stored in this browser only. When the next XER arrives, the team can see whether the questioned signal was resolved or repeated.
This review compares exported schedule evidence. It is not a forecast and does not establish contractual entitlement, causation or a probability of failure.
Oracle documents XER as a proprietary exchange format, notes that baseline export is not supported in the standard XER comparison, and states that P6 EPPM XER exports omit risk data. Financial-period exports also contain only periods with values for the project.